22.07.2019
Ekozub:
Start-up the installation in Saudi Arabia
22.05.2019
Ekozub: Start-up the installation in Saudi Arabia

On 15.05.2019 EKOZUB Ltd company launched a cleaning installation for a waste heat boiler built in the National Industrialization Company TASNEE - Jubail Industrial City, the  of Saudi Arabia. The installation consists of four shockwave generators GFU-24/8. The task of the installation is to clean the soiled surfaces of the heaters of the waste heat boiler. Two generators are located: in the second pass of the boiler at the exhaust outlet and on the side wall of the first boiler pass. The shockwave is triggered automatically every 3-4 minutes and cleans the counter tubes in countercurrent. For more information, please contact us. 

See more  →
17.04.2019
Ekozub:

Happpy Easter

and best wishes:

tasty egg, happy Alleluia

and a lot of luck for every day

wishes Management of EKOZUB Ltd. Company.

See more  →
Completion of the assembly of the furnace cleaning installation in Starachowice.
23.02.2019
Ekozub: Completion of the assembly of the furnace cleaning installation in Starachowice.

On 22/02/2017 was completed installation of the EKW-W 5000 boilers for cleaning tubes for woodchips with grate made by BUD-KOT from Pleszew. The boiler is built in the Celsium company in Starachowice. In this case, one piece of the GFU-24/8 shock wave generator was used, along with the separation of the wave into two streams. The wave outlets are located at the inlet of combustion gases to the tube boilers.

See more  →
Launching the installation of removing overhangs in the bunker at ENWOS Chełmek.
01.02.2019
Ekozub: Launching the installation of removing overhangs in the bunker at ENWOS Chełmek.

In January 2019. an installation for removing overhangs in the coal bunker of the OSR-16 boiler at ENWOS Chełmek was made and started. Generator GFU-24/8 was built on one side of the bunker with four sloping walls. In addition, to increase the field of action, the wave was divided into two streams. After a few days of operation, the User expressed a positive opinion regarding the efficiency of the built-in installation, therefore a twin installation will be made on the other side of the bunker to serve the rest of the chute. Installation of overhangs installation allows for continuous boiler operation without disturbances of smooth operation and elimination of heavy and dangerous work of clearing coal chute.

See more  →
22.07.2019
Start-up the installation in Saudi Arabia
22.05.2019Start-up the installation in Saudi Arabia

On 15.05.2019 EKOZUB Ltd…

17.04.2019

Happpy Easter

Start|About us|||News|Water filters|Shockwave generators|Pipelines Cleaning|Links||Sitemap|Realizations|Contact Ekozub © 2019 All rights reserved
Design and execution: Margomedia
Portal www.ekozub.pl wykorzystuje pliki cookies, czyli tzw "ciasteczka". W przypadku braku akceptacji korzystania z plików cookies prosimy o opuszczenie strony.
Zamknij