Nowoczesne technologie w twoim zasięgu

"Nic, co robisz, nie jest stratą czasu, jeśli umiesz
mądrze korzystać z własnych doświadczeń"

August Rodin

Gwarancja pewnych rozwiązań

"Nic, co robisz, nie jest stratą czasu, jeśli umiesz
mądrze korzystać z własnych doświadczeń"

August Rodin

Nowoczesne technologie w twoim zasięgu

"Nic, co robisz, nie jest stratą czasu, jeśli umiesz
mądrze korzystać z własnych doświadczeń"

August Rodin

Other applications of GFU 24/8 shock wave generators.

Installation of maintaining in the way of the dryer unit in the fuel preparation system for dust boilers.

In June 2016. EKOZUB Ltd Company. launched the installation for restoration of patent the WP-70 boiler dryer unit in Przedsiębiorstwo Energetyki Cieplnej Sp.  o.o. in Gliwice. The installation consists of three shockwave generators GFU-24/8, one for each blow dryer. The systematic operation of the generators keeps the inlet of the combustion gases from the combustion chamber clean to the pressure dryer. Keeping the blow dryer clean ensures safe operation of the fan mill and the boiler. Thanks to the use of GFU-24/8 generators, manual cleaning of the dryer was eliminated, which was to be performed in very dangerous conditions. The operation of the generators did not affect the internal brickwork of the tube dryer negatively

 

Installation for unblocking bottom ash pipes of fluidized bed boilers.

The EKOZUB Ltd. Company. successfully implements the installation of clearing post-discharge chute pipes in fluidized bed boilers. Each fluidized bed boiler has bottom ash bottom pipes that are designed to discharge ash from the combustion chamber. In many cases individual pipes overgrow and create blockages that limit the correct operation of the given chute pipe. After the formation of the blockage, the lack of ash flow usually occurs, in the worst case the boiler is completely shut down and the pipes are forced to be cleaned. After installing the shock wave generators, the problem of pipe overgrowth was eliminated completely. The installation works automatically cleaning the area where congestion forms in the hot air box

 They trusted us:

  • TAURON Jaworzno S.A. - 4 pieces of ash furnaces of the OFz-201 boiler
  • TAURON Power Plant Jaworzno S.A.- pours ash boiler CFB-260
  • TAURON Preparation of S.A. Siersza Power Plant in Trzebinia - chute pipes from the boiler OFZ-425 no. 1
  • Synthos Dwory 7 Sp. from o.o.-debris of bottom ash of the OFz-140 boiler
  • TAURON Preparation of S.A. Siersza Power Plant in Trzebinia - chute pipes from the boiler OFZ-425 no. 2

Download files

Pobierz plik Instalacja czyszczenia rurosuszarek na wlocie do kotła ze strony Dentica24Instalacja czyszczenia rurosuszarek na wlocie do kotła
(plik PDF, 297.04 KB)

Subpages

Start-up the installation in Saudi Arabia
22.05.2019Start-up the installation in Saudi Arabia

On 15.05.2019 EKOZUB Ltd…

17.04.2019

Happpy Easter

Start|About us|||News|Water filters|Shockwave generators|Pipelines Cleaning|Links||Sitemap|Realizations|Contact Ekozub © 2019 All rights reserved
Design and execution: Margomedia
Portal www.ekozub.pl wykorzystuje pliki cookies, czyli tzw "ciasteczka". W przypadku braku akceptacji korzystania z plików cookies prosimy o opuszczenie strony.
Zamknij